Pascal Steel

Current News at Pascal Steel Corp.

LEED CERTIFIED TEAM MEMBERS

Pascal Steel is pleased to announce that two of its employees are in various stages of becoming LEED accredited. These team members will contribute to the consultation process of our clients and educating everyone involved in the project on the most viable, earth friendly practices we can incorporate into our work environment. Through this achievement Pascal Steel continues to build a high level of added value in our industry not only in terms of experience, customer satisfaction, credibility and integrity but in our need to continue to find ways to lessen the impact on the environment.

Pascal Steel's Design/Build Solar Carport Structures

Pascal Steel Strengthens Commitment to the Environment

Over the past year Pascal Steel has moved steadily forward strengthening our commitment to the environment by offering solar panel integration with our metal building systems. To date, we have successfully completed several solar PV system carport structures and are now in the beginning stages of larger-scale solar projects.

If you are considering environmentally conscience alternatives for your pre-engineered metal building let us help. We can design, supply and erect a complete structure tailored to your individual needs which will produce maximum results from solar energy, saving you money, increasing your profits and providing you peace-of-mind. 

Our focus and dedication to the design and erection of pre-engineered metal buildings that will support photovoltaic systems ultimately represents the responsibility of Pascal Steel relative to the needs of our clients, the needs of our environment and to our overall conservation ethic.

These photos are from a recent solar carport project at St. Marys Hospital in Apple Valley, CA.

Solar Carports - No Roof Panel Design Solar Caroprt Design No Roof Panel Carport Design for Solar

Pascal Steel Corporation completes Camp Pendleton Recycle Center

Pascal Steel Corporation completed the design/build MCB Camp Pendleton Facilities Maintenance Department.

Pre-Engineered Canopy
Preengineered Canopy
Prefabricated Canopy
Metal Canopy

Examples of what the MCB Camp Pendleton Recycling Program has diverted 2002-2008

Cardboard 15,520,000 pounds

Paper 5,404,406 pounds

Brass 3,509,930 pounds

Glass 995,572 pounds

Plastics 580,763 pounds

Aluminum Cans 119,224 pounds

Camp Pendleton Recycling Center
Steel Canopy
Metal Canopy Design
Pre-Engineered Metal Canopy System

ANOTHER PRE-ENGINEERED METAL BUILDING AWARDED TO PASCAL STEEL

Pascal Steel has been awarded a Pre-Engineered Metal Building at the Naval base at North Island, Coronado, CA. The metal building is part of a larger project renovating hangar 1456. We are pleased to announce stamped drawings were delivered to the general contractor within four business days after we received the letter of intent to begin. We hope to complete this project during the 2nd quarter of 2008.

555 2nd Street Suite 4, Encinitas CA 92024 | Phone: (800) 797-7833 | Fax: (760) 944-7755